ASD-STAN prEN 9136 P1

Aerospace Series – Root Cause Analysis and Problem Solving (9S Methodology)

 
Form: prEN Registration Number: 9136 Edition: P1
Date of Publication: 01-Nov-2016 Number of pages: 58
Document Type: prEN Domain: Quality
Scope: 1.1 General The objective of any organization, as part of continual improvement, is to reduce the number of issues (i. e., undesirable conditions, defects, failures) and to minimize their impact on quality, delivery performance, and cost. This includes having processes in place to detect and eradicate significant and recurrent issues, which implies having well identified problems, a common understanding of their impact and associated root causes, and having defined and implemented adequate actions so that these problems, including similar issues will not happen again. 1.2 Purpose Propose a methodology to improve the way escapes and issues are managed, including communication between all parties [e. g., engineering, Materials Review Board (MRB), manufacturing, manufacturing engineering, supplier, customer] to reduce their impact, contain them as far upstream as possible, and prevent recurrence (i. e., ensure the right measures are taken at the right location and at the right time).
Status: Superseded Replaced by: DIN EN 9136:2018
Price (excl. VAT): €125.00
Normative References: EN 9100 EN-9110 EN-9120 EN-ISO 9000:2005